Still more work welches scheduled to complete the Elster-Saale canal. Such a move would allow small boats to reach the Elbe from Leipzig. The intended completion date has been postponed because of an unacceptable cost-benefit ratio. Hinein the 2010s, Leipzig was often referred to as Hypezig, as overblown comparisons were https://employerbrandingagenturle98753.tokka-blog.com/32007787/gerücht-buzz-auf-kommunikationsagentur-leipzig