1

High-Efficiency 400 kW Chiller Installation Achieves £50,000 Yearly Energy Savings and 200 Metric Tonnes CO₂ Reduction

News Discuss 
Project Summary Newsome has successfully delivered the installation and commissioning of a modern 400 kW chiller at a major confectionery manufacturing site in York. Designed to reinforce ESG targets, the installation enhances cooling reliability while cutting overall power consumption and CO₂ discharge. https://socialskates.com/story22091830/high-efficiency-400-kw-chiller-installation-delivers-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story