Installation Overview Newsome has recently completed the installation and commissioning of a high-performance 400 kW chiller at a leading confectionery manufacturing site in York. This initiative reflects a notable step forward in the client’s Environmental, Social and Governance framework, enhancing operational resilience and achieving measurable reductions in both energy consumption https://socialmediastore.net/story21726111/advanced-400-kw-chiller-installation-secures-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-cut